


10 Mile Road
10 Mile Road between Ryan Road and Lorraine Avenue in Warren and Center Line. Through April 6, 10 Mile Road will be closed to thru traffic east and west of Van Dyke Avenue intersection for storm sewer work. No turns will be allowed from Van Dyke onto 10 Mile in either direction. Access to residential and business properties will be maintained throughout the duration of the project. Project consists of road rehabilitation between Ryan Road and Sherwood Avenue and road reconstruction between Sherwood Avenue and Lorraine Avenue. Drivers are encouraged to follow posted detours and seek alternate routes when possible. Project duration through November.
18 Mile Road Bridge
18 Mile Road Bridge over the Plumbrook Drain in Sterling Heights. 18 Mile Road between Van Dyke Avenue and Mound Road will be closed to through traffic. Access to all residential and business properties will be maintained throughout the duration of the project. Drivers are encouraged to follow the posted detour and seek alternate routes. Project consists of removal and replacement of the existing bridge deck with a new concrete deck, steel painting, full depth road construction, guardrail and restoration work. Project duration is anticipated to be through June.
34 Mile Road Bridge
34 Mile Road Bridge over Highbank Creek between Armada Ridge Road and Russ Road. 34 Mile Road will be closed to thru traffic between Armada Ridge Road and Russ Road due to bridge replacement. Drivers are encouraged to follow posted detours and seek alternate routes when possible. Project duration is through August.
Clinton River Trail
Due to a washout on the Clinton River Trail in Rochester, the trail has been closed west of the Macomb Orchard Trail and Dequindre Road. Follow the posted detour route.
Dequindre Road, Shelby Twp.
The Great Lakes Water Authority (GLWA) is continuing to work on the second phase of infrastructure improvements in the area of Dequindre Road between Hamlin Road and Avon Road and Dequindre Road between 23 Mile Road and 24 Mile Road is expected to be closed through fall. The Clinton River Trail and Macomb Orchard Trail between Letica Drive and 24 Mile Road will be closed. Drivers are encouraged to follow the posted detours and seek alternate routes when possible. Project consists of installation of new 96-inch water transmission main and is part of GLWA project. Project duration through Dec. 31.
Garfield Road
Garfield Road between 14 Mile and 15 Mile roads in Fraser. Northbound traffic will be maintained on the southbound lanes of Garfield Road. Southbound traffic on Garfield Road will be detoured to Utica Road. The eastbound right turn lane and westbound left turn lane of 15 Mile Road will be closed at Garfield Road. The westbound left turn lane from Klein Road to Garfield Road will be closed. Drivers are encouraged to follow the posted detours and seek alternate routes when possible. Project consists of road reconstruction and duration is through August.
South River Road Bridge
South River Road Bridge over the channel to Lake St. Clair east of Lakeshore Drive in Harrison Township. South River Road will remain open to traffic. A temporary bridge structure will be in place. Project consists of bridge replacement. Project duration will be through August.
I-275
In Wayne County, southbound I-275 ramp to eastbound I-94 will be closed from 9 a.m. Saturday to 5 a.m. Monday for pipe work.
In Wayne County, northbound I-275 ramp to westbound M-14 will be closed for construction through Nov. 15.
I-696
In Oakland County, northbound and southbound I-696 Service Drive /11 Mile crossover bridge west of Southfield Road will be closed until late April for bridge repair.
Eastbound I-696 will be closed from M-10 to I-75 for road reconstruction through Nov. 15, 2026.
I-75
In Oakland and Genesee counties, southbound I-75 will have one lane open from Holly to Belford for pavement marking/barrier wall placement for traffic shift from 5 a.m. Saturday to 5 a.m. Monday.
In Oakland and Genesee counties, southbound I-75 will have two lanes open from Holly to M-15/Ortonville for pavement marking/barrier wall placement for traffic shift from 5 a.m. Saturday until early November.
In Oakland County, southbound I-75 ramp to Grange Hall will be closed for pavement marking/barrier wall placement for traffic shift. from 5 a.m. Saturday to 5 a.m. Monday.
In Oakland County, southbound I-75 ramp to and from M-15/Ortonville will be closed for pavement marking/barrier wall placement for traffic shift from 5 a.m. Saturday to 5 a.m Monday.
In Oakland County, southbound I-75 will have one lane open from US-24/Dixie Highway to Clarkston Road for pavement marking/barrier wall placement for traffic shift from 5 a.m. Saturday to 5 a.m. Monday.
In Oakland County, southbound I-75 ramps to and from northbound and southbound US-24/Dixie Highway will be closed from 5 a.m. Saturday to early November for for pavement marking/barrier wall placement for traffic shift.
In Oakland County, eastbound and westbound Grange Hall ramp to southbound I-75 will be closed for pavement marking/barrier wall placement for traffic shift from 5 a.m. Saturday until early November.
In Oakland County, southbound I-75 ramps to and from Holly Road will be closed for pavement marking/barrier wall placement for traffic shift from 5 a.m. Saturday until early November.
In Wayne County, northbound I-75 service drive at Caniff will have the left lane closed for construction with lane shift until 7 p.m. April 14.
In Wayne County, northbound I-75 service drive from Wilde Street to Waterman Street will have one lane open until mid-May for watermain work.
In Oakland County, northbound Dixie Highway/Saginaw Road ramp to I-75 will be closed until early November for construction.
In Oakland County, eastbound and westbound East Holly ramp to northbound I-75 will be closed until early November for construction.
I-75 from M-15 to Genesee county line will have two lanes open until 7 p.m. Nov. 3.
I-94
In Wayne County, eastbound I-94 will have one lane open from Moross Road to Allard Avenue from 9 a.m.-3 p.m. Saturday for bridge scoping.
In Wayne County, eastbound I-94 ramp to Allard Avenue will be closed from noon-3 p.m. Saturday for bridge scoping.
In Wayne County, eastbound I-94 will have two lanes open from Middlebelt to Ecorse from 9 a.m.-3 p.m. daily through May 4 for median utility work.
I-96
In Wayne County, westbound I-96 ramp to US-24/Telegraph will have one ramp lane open from 7 a.m.-3 p.m. Saturday for virgil bridge work.
In Wayne County, westbound I-96 Express ramp to M-39 will be closed from 6 a.m.-5 p.m. Monday for maintenance.
M-1 (Woodward)
In Oakland County, southbound M-1 at South Boulevard will have three lanes open from 9 a.m.-3 p.m. Monday through April 18 for cable installation.
M-10 (Lodge)
In Oakland County, southbound M-10 at 8 Mile Road will have two lanes open until 6 p.m. April 6 for retaining wall.
In Oakland County, northbound and southbound Greenfield ramp to southbound M-10 will be closed until early April for retaining wall.
In Oakland County, southbound M-10 Service Drive from 8 Mile Road to Seven Mile Road will have one lane open until early April for retaining wall.
In Wayne County, southbound M-10 ramp to Larned will be closed until late May for bridge work.
M-14/I-96
In Wayne County, eastbound M-14/I-96 will have one lane open from Sheldon to Newburgh until September for bridge rehabilitation and road and ramp reconstruction.
M-15 (Ortonville)
In Oakland County, southbound M-15 ramp to southbound I-75 will be closed from 5 a.m. Saturday until early November for temporary markings/barrier wall.
M-85 (Fort Street)
In Wayne County, eastbound M-85 will have one lane open at McKinstry Street to Clark Street from 7 a.m. Monday until April 18 for gas main work.
In Wayne County, eastbound and westbound M-85 will have one lane open at Livernois Avenue from 9 a.m.-3 p.m. until late April for utility/lighting work.
M-97 (Groesbeck)
In Wayne County, southbound M-97 will have one lane open from State Fair Street to Seven Mile Road from 9 a.m.-3 p.m. Monday-Saturday through May 9 for gas main work.
M-102 (8 Mile Road)
In Wayne and Oakland counties, westbound 8 Mile Road ramp to northbound and southbound US-24/Telegraph will be closed from 7 a.m. Monday until mid-April for a watermain break repair.
In Oakland and Wayne counties, westbound M-102 will have two lanes open from Southfield Road to Lahser Road until June.
US-12 (Michigan)
In Wayne County, westbound US-12 will have one lane open from Beech Daly to Middlebelt until 5 p.m. April 5 for water main work.
US-24 (Telegraph)
In Wayne and Oakland counties, northbound U.S.-24 at M-102/8 Mile Road will have one lane open from 9 a.m.-3 p.m. daily Monday through mid-April for water main work.
In Wayne County, northbound US-24 from M-5/Grand River to 8 Mile Road will have two lanes open except for between 9 a.m.-3 p.m., starting 7 a.m. Monday through mid-April for water main work.
In Wayne County, northbound and southbound U.S.-24 ramps to eastbound I-96 will be closed until 5 a.m. Monday.
— MediaNews Group staff