10 Mile Road

10 Mile Road between Ryan Road and Lorraine Avenue in Warren and Center Line. One lane of traffic will be maintained in each direction. Turning movements from 10 Mile Road onto intersecting roads will be restricted at times with flagging operations in place. Starting April 28, 10 Mile Road will be closed at the railroad crossing between Garden Court and Liberal Street. Sherwood Avenue will be closed at 10 Mile Road. Access to residential and business properties will be maintained throughout the duration of the project. Project consists of road rehabilitation between Ryan Road and Sherwood Avenue and road reconstruction between Sherwood Avenue and Lorraine Avenue. Drivers are encouraged to follow posted detours and seek alternate routes when possible. Project duration through November.

18 Mile Road Bridge

18 Mile Road bridge over the Plumbrook Drain in Sterling Heights. 18 Mile Road between Van Dyke Avenue and Mound Road will be closed to through traffic. Access to all residential and business properties will be maintained throughout the duration of the project. Drivers are encouraged to follow the posted detour and seek alternate routes. Project consists of removal and replacement of the existing bridge deck with a new concrete deck, steel painting, full depth road construction, guardrail and restoration work. Project duration is anticipated to be through June.

34 Mile Road Bridge

34 Mile Road Bridge over Highbank Creek between Armada Ridge Road and Russ Road. 34 Mile Road will be closed to thru traffic between Armada Ridge Road and Russ Road due to bridge replacement. Drivers are encouraged to follow posted detours and seek alternate routes when possible. Project duration is through August.

Armada Ridge Road

Armada Ridge Road between west of Russ Road and west of Cryderman Road in Richmond Township. The road will remain open to traffic with intermittent flagging operations in place during construction operations for approximately 30 days. Drivers should expect delays and are encouraged to seek alternate routes. Project consists of asphalt preservation and resurfacing and is part of MCDR’s 2025 pavement preservation program. Project duration through June.

Clinton River Trail

Due to a washout on the Clinton River Trail in Rochester, the trail has been closed west of the Macomb Orchard Trail and Dequindre Road. Follow the posted detour route.

Dequindre Road, Shelby Twp.

The Great Lakes Water Authority (GLWA) is continuing to work on the second phase of infrastructure improvements in the area of Dequindre Road between Hamlin Road and Avon Road and Dequindre Road between 23 Mile Road and 24 Mile Road is expected to be closed through fall. The Clinton River Trail and Macomb Orchard Trail between Letica Drive and 24 Mile Road will be closed. Drivers are encouraged to follow the posted detours and seek alternate routes when possible. Project consists of installation of new 96-inch water transmission main and is part of GLWA project. Project duration through Dec. 31.

Garfield Road

Garfield Road between 14 Mile and 15 Mile roads in Fraser. Northbound traffic will be maintained on the southbound lanes of Garfield Road. Southbound traffic on Garfield Road will be detoured to Utica Road. The eastbound right turn lane and westbound left turn lane of 15 Mile Road will be closed at Garfield Road. The westbound left turn lane from Klein Road to Garfield Road will be closed. Drivers are encouraged to follow the posted detours and seek alternate routes when possible. Project consists of road reconstruction and duration is through August.

Haven Ridge Road

Haven Ridge Road between Rambling Lane and 31 Mile Road in Lenox Township. The road will remain open to traffic with intermittent flagging operations in place during construction operations for approximately 30 days. Drivers should expect delays and are encouraged to seek alternate routes. Project consists of asphalt preservation and resurfacing and is part of MCDR’s 2025 pavement preservation program. Project duration through June.

Jefferson Avenue

In Wayne County, eastbound west Jefferson is closed at southbound M-10 until 5 a.m. Monday for road repair.

In Wayne County, westbound Jefferson is closed overnight from Rivard Street to St. Antoine until 5 a.m. Tuesday for Grand Prix prep.

McKay Road

McKay Road between 33 and 34 Mile Road in Bruce Township. The road will remain open to traffic with intermittent flagging operations in place during construction operations for approximately 30 days. Drivers should expect delays and are encouraged to seek alternate routes. Project consists of asphalt preservation and resurfacing and is part of MCDR’s 2025 pavement preservation program. Project duration through June.

South River Road Bridge

South River Road bridge over the channel to Lake St. Clair east of Lakeshore Drive in Harrison Township. South River Road will remain open to traffic, but there are alternative boat launch locations available in Macomb County. A temporary bridge structure will be in place. Project consists of bridge replacement. Project duration will be through August.

M-3 (Gratiot)

In Macomb County, northbound and southbound M-3 will have one lane open overnight from Sandpiper Drive to 21 Mile Road from 7 p.m.-5 a.m. through May 19 for concrete curb/sidewalk work.

M-53 (Van Dyke Avenue)

In Macomb County, southbound M-53 will be closed from M-59/Hall Road to 18 1/2 Mile Road until 7 p.m. Sunday for paving.

In Macomb County, southbound M-53 at Clinton River Road will have one lane open until 3 p.m. May 22 for bridge work.

M-59 (Hall Road)

In Macomb County, eastbound and westbound M-59 ramps to southbound M-53 will be closed until 7 p.m. Sunday for paving.

I-94

In Macomb County, 10 Mile ramp to eastbound I-94 will be closed from 9 a.m. Tuesday until 4 p.m. Saturday for drainage work.

In Wayne County, westbound I-94 will have one lane open from Oakwood to M-39/Southfield until 5 a.m. Monday for road repair.

I-275

In Wayne County, northbound I-275 ramp to eastbound I-96 will be closed until late June for reconstruction.

In Wayne County, northbound I-275 ramp to westbound M-14 will be closed for construction through Nov. 15.

I-375

In Wayne County, southbound I-375 Service Drive will be closed from Larned Street to Jefferson from 7 p.m. Saturday until 5 a.m. Tuesday for Grand Prix prep.

I-696

In Oakland County, westbound I-696 Service Drive crossover will be closed west of Evergreen from 7 a.m. Monday until early June.

In Oakland County, eastbound I-696 Service Drive/10 Mile at Coolidge Highway will have one lane open from 7 a.m. Monday until mid-July for ramp work.

In Oakland County, eastbound I-696 Service Drive/10 Mile at M-1/Woodward will have one lane open from 7 a.m. Monday until mid-July for ramp work.

In Oakland County, eastbound and westbound I-696 Service Drive/10 Mile at Campbell Road/Hilton will have one lane open from 7 a.m. Monday until mid-July for ramp work.

In Oakland County, westbound I-696 from Southfield Road to Lahser Road will have two lanes open until late July for bridge repair.

Westbound I-696 will be closed from I-75 to M-10 through 5 a.m. Monday for bridge demo.

Eastbound I-696 will be closed from M-10 to I-75 for road reconstruction through Nov. 15, 2026.

I-75

In Wayne County, southbound I-75 ramp to southbound M-10 will be closed until 5 a.m. Monday for road repair.

In Wayne County, southbound I-75 near Michigan will have one lane open from 6 a.m. Saturday until 6 p.m. Sunday for road repair.

In Wayne County, northbound and southbound Springwells ramp to southbound I-75 will be closed intermittently from 7 a.m. Saturday until 6 p.m. Sunday for fence work.

In Wayne County, northbound and southbound I-75 will have one lane open intermittently from Schaefer to Dearborn Street until 5 a.m. Saturday for bridge work.

In Wayne County, northbound and southbound I-75 will have one lane open from Huron River Drive to Sibley with moving lane closures until noon Sunday.

In Wayne County, northbound and southbound Schaefer/M-85/Fort Street ramp to northbound I-75 will be closed until 5 a.m. Saturday for road repair.

In Wayne County, northbound I-75 ramp to southbound M-10 will be closed until 5 a.m. Monday for road repair.

In Oakland and Genesee counties, southbound I-75 will have two lanes open from Holly to M-15/Ortonville for pavement marking/barrier wall placement for traffic shift until early November.

In Oakland County, southbound I-75 ramps to and from northbound and southbound US-24/Dixie Highway will be closed until early November for for pavement marking/barrier wall placement for traffic shift.

In Oakland County, eastbound and westbound Grange Hall ramp to southbound I-75 will be closed for pavement marking/barrier wall placement for traffic shift until early November.

In Oakland County, southbound I-75 ramps to and from Holly Road will be closed for pavement marking/barrier wall placement for traffic shift until early November.

In Wayne County, northbound I-75 service drive from Wilde Street to Waterman Street will have one lane open until mid-May for watermain work.

In Oakland County, northbound Dixie Highway/Saginaw Road ramp to I-75 will be closed until early November for construction.

In Oakland County, eastbound and westbound East Holly ramp to northbound I-75 will be closed until early November for construction.

I-75 from M-15 to Genesee county line will have two lanes open until 7 p.m. Nov. 3.

I-96

In Wayne County, westbound I-96 will have two lanes open from West Grand Boulevard to Joy Road from 8 a.m.-2 p.m. Saturday for bridge work.

In Wayne County, westbound I-96 ramp to Joy Road will be closed from 11 a.m.-2 p.m. Saturday for bridge work.

In Wayne County, West Grand Boulevard ramps to westbound I-96 will be closed from 11 a.m.-2 p.m. Saturday for bridge work.

In Wayne County, eastbound I-96 ramp to Newburgh will be closed until late June for reconstruction.

In Wayne County, eastbound Schoolcraft Road at Newburgh will have one lane open through late June for reconstruction.

M-1 (Woodward)

In Wayne County, northbound and southbound M-1 from Seven Mile Road to Eight Mile Road will have two lanes open until May 21 for road repairs.

M-5

In Wayne County, westbound M-5 from Rosa Parks Blvd to Martin Luther King Jr. Boulevard will have one lane open until May 23 for utility work.

M-10 (Lodge)

In Wayne County, southbound M-10 will be closed from I-75 to Griswold until 5 a.m. Monday, including all ramps, for road repair.

In Wayne County, southbound M-10 will have one lane open from Warren Avenue to I-75 until 5 p.m. Saturday for road work.

In Wayne County, northbound M-10 will have one lane open from Jefferson to I-94 until 5 p.m. Saturday for road work.

In Wayne County, southbound M-10 ramp to Larned will be closed until late May for bridge work.

M-14

In Wayne County, eastbound M-14 ramp to Sheldon will be closed until late June for construction.

In Wayne County, northbound Sheldon at M-14 will have one lane open until May 19 for construction.

In Wayne County, Beck Road ramps to eastbound M-14 are expected to reopen May 19.

M-14/I-96

In Wayne County, eastbound M-14/I-96 will have one lane open from Sheldon to Newburgh until September for bridge rehabilitation and road and ramp reconstruction.

M-15 (Ortonville)

In Oakland County, southbound M-15 ramp to southbound I-75 will be closed until early November for temporary markings/barrier wall.

M-102 (8 Mile Road)

In Oakland and Wayne counties, westbound M-102 will have two lanes open from Southfield Road to Lahser Road until June.

US-24 (Telegraph)

In Oakland County, northbound US-24 will have two lanes open from Lincoln Road to Maple Road from 7 a.m.-7 p.m. Saturday for gas main work.

— MediaNews Group staff