Print      
One day down
If the rest of Pikeopalypse is this easy, commuters’ summers may be saved after all
Delays on the Massachusetts Turnpike were shorter than expected Monday as construction continued on the Commonwealth Avenue bridge (foreground). (Keith Bedford/Globe Staff)
Pat Greenhouse/Globe Staff
With construction cranes as a backdrop, a group took part in a circuit training session on the closed Boston University Bridge. (Pat Greenhouse/Globe StaffKeith Bedford/Globe Staff)
Inbound traffic was heavy Monday morning. Below, construction workers toiled on the bridge.

Mon

July 31

Tues

Aug. 1

Wed

Aug. 2

Thurs

Aug. 3

Fri

Aug. 4

Mon

Aug. 7

Tues

Aug. 8

Mon

Aug. 28

Traffic on Pike changes to two lanes in each direction in the day

Three lanes

Four lanes